This job ad has been posted over 40 days ago...
0

applicants

full time Semiconductor Toolings Technicians

at Jimmy S. Lababo in Australia



Jimmy S. Lababo
#34 G. Bunyi St., Buting, Pasig City
Email: jslababo@yahoo.com.ph
jslababo@live.com
Mobile No.: (+966) 543436134

Personal Data:

Date of Birth : April 26, 1973
Place of Birth : 34 Bunyi St., Buting Pasig City
Nationality : Filipino
Civil Status : Married
Religion : Roman Catholic
Age : 36
Height : 5’ 2 ’’
Weight : 80lbs.

Educational Background:

Elementary : Buting Elem. School ,Pasig City- 1985

Secondary : Rizal High School , Pasig City - 1989

College : Patts Colleges Of Aeronautics -1991


Personal Traits:
- Hardworking, Honest, Punctual & with Self –Discipline. ¬



Work Experience


Position : Line Maintenace Plastic Injection Molding/Forklift Maintenance
Section : Maintenance/Engineering.
Company : Rowad National Plastic Co.Ltd.
Address : P.O.Box 29452, Riyadh 11457 Kingdom Of Saudi Arabia/Riyadh.
Inclusive Date : March 19, 2009 – March 19, 2011






Psi Representative Machine Buy-Off
(at Micron South Korea)

Inclusive date : Jan.20 to 25 2003
Purchase 2 Machine,STD.TO-220 240 Cavity.


Professional Employment:

Position : Maintenance at A.O.D. ---- PAL
Inclusive date :1991

Position : Facilities Contractual
Section : Facilities Department
Company : Psi Technologies, Inc.
Address : Electronics Ave., FTI Complex, Taguig, Metro Manila
Inclusive date : 1992


Position : Power 1 PDIP Mold Production Operator
Section : EE/BE Mold Section
Company : Psi Technologies, Inc.
Address : Electronics Ave., FTI Complex, Taguig, Metro Manila
Inclusive date : 1994 - 1995


Position : PM and Mold Tool Line Technician I
Section : Equipment Engineering – Backend (Mold)
Company : Psi Technologies, Inc.
Address : Electronics Ave., FTI Complex, Taguig, Metro Manila
Inclusive date : 1995 - 1998


Position : PM and Mold Tool Line Technician II
Section : Equipment Engineering – Backend (Mold)
Company : Psi Technologies, Inc.
Address : Electronics Ave., FTI Complex, Taguig, Metro Manila
Inclusive Date : October 10, 1998 – April 2000



Position : PM and Mold Tool Line Maintenance Technician III
Section : Equipment Engineering – Backend (Mold)
Company : PSi Technologies, Inc.
Address : Electronics Ave., FTI Complex, Taguig, Metro Manila
Inclusive Date : May 15, 2002





Position : PM and Mold Tool Line Maintenace Supervisor/ Engineer
Section : Equipment Engineering – Backend (Mold)
Company : PSi Technologies, Inc.
Address : Electronics Ave., FTI Complex, Taguig, Metro Manila
Inclusive Date : May 15, 2002 – March 5, 2008


Basic Functions:

Responsible for supervising line technicians to maintain and / or improve performance in both PDIP and Power backend section.


Duties & Responsibilities:

1. Supervises work activities of technicians engaged in providing sustaining maintenance of the machines and equipment at PDIP / POWER Backend.
2. Plans, schedules and delegates equipment sustaining activities like equipment evaluation projects, corrective actions of line problems, etc.

3. Monitors and coordinates the performance of line technicians in their assigned activities according to timetable.
4. Analyzes and conducts immediate actions to equipment related problems
5. Implements existing equipment sustaining procedures and standard operating procedures. Coordinates with Sr. supervisors and other members of the group in the modification of the same.
6. Initiates modifications on machines for more efficient and productive machine operations
7. Conducts spareparts evaluation to determine the tool life necessary for cost reduction and searches for better substitute.
8. Monitors spareparts inventory and prepare requisitions for the replacement of the same.
9. Prepares engineering specification requirements for equipment operations and maintenance
10. Monitors equipment performance, evaluates and gives recommendations of major machine breakdown as well as long term to recurring machine problem.
11. Conducts equipment evaluation to determine the need for modification
12. Overseas the implementation of special projects to upgrade the equipment performance and maintenance.
13. Assists customers in conducting spot audit at PDIP/ POWER Backend; prepares the necessary documents required in Equipment Engineering.
14. Ensures that appropriate safety measures are observed in all areas of concern.
15. Submits regular report of activities in the area of responsibility
16. Maintain good housekeeping in the area of responsibility
17. Performs other duties common to supervisory positions.
18. Supports the environmental management system program initiated by the company
19. Performs duties as may be assigned.






EE-BE PM Mold Tool and Line Maintenance Sustaining Job Accomplishment :

1. Reworked of bottom gate insert and re-grinding of core island of the following mold tools:
A) All to-220 (Polished)

B) To-220 (Matte)
1. MTB-001
2. MTB-002
3. MTB-003
4. MTB-004

2. Top vent block modification. pinching key fabrication of the following mold tools:
A) TO-220 (Polished)
1. MTA-006
2. MTA-007
3. MTA-009

3. Re-angle of bottom gate insert (from 3 to 5°) of the following mold tools:
A) TO-220 (Polished)
1. MTA-003
2. MTA-006
3. MTA-008
4. MTA-009
4. Modification of Top Island insert from Insert Type to Solid Type:
Note: Incorporate to newly Purchase Machine.
1. MTA-016
2. MTA-017
3. MTA-002
5. Modification of Btm. Gate insert from Core Island Type to No Island Type:
Note: Incorporate to newly Purchase Machine.
1. MTA-016
2. MTA-017
3 MTA-002
6. Modification of Btm.Core Island from No Anti-blown Heatsink to Incorporate Blown Heatsink Blk..
Note: Gdl On-Sem tool.


1. MTF-C03
2. MTF-C04
3. MTF-C05






Seminars & Training Attended (at PSi):

SPC Training/Workshop- April 1995

Sumitomo Bakelite Mold Compound Seminar – 1998

Compressed Air Treatment And Drying – Feb. 1998

Total Preventive Maintenance (TPM) Seminar – Oct. 1998

Forklift Operation Procedure Seminar – Oct. 1999

PROMIS Training / Workshop – Jan. 2002

Housekeeping Awarness Campaign –May 2002

Mold Encapsulation Technology – May 2002

Employee Handline Discipline –June 2002

Tekology Equiptment Maintenance System – August 2002

T.I. Re Qualification – June 2005


Character References:

Danilo B. Visperas
Mold Sec. Manager
PSi Technologies, Inc.

Felix Maylas
Sr. Supervisor – Facilities
PSi Technologies, Inc.

Medy J. Chua
Director -Eqpt. Eng’g.
PSi Technologies, Inc.

Bong Sadural
Sr.P.E./PROD./Eqpt../Manager
PSi Technologies, Inc.

I hereby certify that the stated information are true and correct to the best of my knowledge and belief.

JIMMY S. LABABO
EE-BE MOLD
BN. 4309

« go back to homepage
Is this job ad fake? Report it!   
Recommend to a friend
Published at 02-02-2010
Viewed: 46 times